⚡ QOZ Certified · Berkeley County, SC

19→50 MW
Near-Term Power Path.

A 500-acre Industrial 4.0 energy campus positioned for AI inference, advanced manufacturing, rail-served logistics, BESS, and commercial-industrial mixed use — available as a 250-acre parcel or the full 500-acre campus.

South Carolina-Inspired Design · Palmetto Blue · White · Institutional Clarity

Industrial 4.0 · Power · Land · Fiber · Rail

Russellville Southern Vista aerial from the May 2026 site site materials
Russellville Site
A 250- or 500-acre infrastructure platform engineered around a practical 19→50 MW near-term power path.
Site Visual
19→50 MW
Near-Term Power
250 / 500
Acres · Divisible
115 kV
Existing Interconnect
QOZ
Opportunity Zone
Fiber
Connectivity Ready

Real Infrastructure. Real Site Readiness.

Aerial views, utility infrastructure, on-site substation assets, and dark-fiber connectivity reinforce Russellville’s scale, readiness, and credibility as an execution-ready Industrial 4.0 energy campus.

Russellville Northern Vista aerial from the site site materials
Northern Vista

250- or 500-acre campus context.

Aerial view showing the Russellville site, river adjacency, and regional scale.

Russellville utility and site overlay map
Utility / Site Overlay

Power corridors and campus planning.

Site-map visual supporting the staged 19 MW to 50 MW utility path and campus planning.

On-site Russellville substation photo
On-Site Substation

Near-term energization asset.

Actual substation photo reinforces the day-one power-ready message.

Domestic and international dark fiber route visual
Domestic & International Dark Fiber

Regional connectivity with cable-landing context.

Fiber route visual supports the Power · Land · Fiber positioning.

Visuals are embedded directly in this HTML file for easier sharing and publishing.

Near-Term Power Plan · Santee Cooper

From 19 MW Now to 50 MW Near-Term

Russellville is positioned around a practical 19→50 MW power pathway using the existing 115 kV interconnect and on-site substation infrastructure.

Step 1 — Initial Allocation

19 MW Near-Term Power

Initial 19 MW service aligns with the existing 115 kV interconnect and on-site infrastructure, creating a credible starting block for AI inference and Industrial 4.0 users.

Step 2 — Equipment Upgrade

Scale Toward 50 MW

The 19 MW path can scale toward 50 MW through transformer, breaker, and related equipment upgrades at the existing substation framework.

Optional Resilience

BESS / On-Site Energy Optionality

Battery storage and energy-infrastructure options can support resilience, peak management, and future campus flexibility without distracting from the near-term 19→50 MW utility story.

19 MW
Initial
Power Path
50 MW
Near-Term
Scale Target
115 kV
Existing
Interconnect
Flagship Asset · Berkeley County, SC
★ Qualified Opportunity Zone · Berkeley County, SC

Russellville Infrastructure Platform

500 acres — divisible into a 250-acre parcel. 8 years under development. Power · Land · Fiber — positioned for AI inference, Industrial 4.0 users, advanced manufacturing, and commercial-industrial mixed use.

Russellville Platform — Land, Power & Fiber

Berkeley County, South Carolina · 250 or 500 Acres · 8 Years Under Development

Land
250 or 500 Acres · 50% Greenfield / 50% Brownfield
Parcel Options
250-Acre Parcel or Full 500-Acre Campus
Power Now
19→50 MW · Near-Term Utility Path
Interconnect
Existing 115 kV Interconnect Path
Substations
115–34.5 kV and 115–12 kV On-Site
Fiber
DC BLOX + Cable-Landing Connectivity
Rail / Logistics
Industrial 4.0 Mixed-Use Optionality
Incentives
SC Tax Exemptions + QOZ Benefits
No Prepayment
No First-Year PPA Prepayment Required
Acquisition Options

250 Acres or 500 Acres

The campus is divisible. Buyers can acquire a 250-acre power-ready parcel or the full 500-acre platform — both underwritten on the same existing 115 kV interconnect and the same 19→50 MW near-term power path.

Parcel Acquisition
250 Acres

A right-sized entry point for a single AI inference, Industrial 4.0, or advanced-manufacturing user that needs power-ready land now without underwriting the full campus.

  • Served by the same existing 115 kV interconnect and on-site substation assets
  • 19 MW available now, with participation in the path toward 50 MW
  • Qualified Opportunity Zone benefits apply to the parcel
  • Balance of the campus remains available for future expansion
Full Campus
500 Acres

The complete Industrial 4.0 energy campus for operators and capital partners seeking scale, phasing control, and long-term expansion capacity.

  • Entire 500-acre platform — 50% greenfield / 50% brownfield
  • Full control of the 19→50 MW near-term power path
  • Rail, fiber, and BESS optionality across the whole campus
  • Master-plan flexibility for phased, multi-user build-out

Parcel configuration, boundaries, and power allocation are confirmed in diligence and documented in the definitive agreement. Power timing and capacity remain subject to final utility documentation.

What We Offer

Infrastructure Solutions

From raw land to shovel-ready campus — we manage every step of the infrastructure development lifecycle.

🏗️

Site Acquisition & Entitlement

Full-cycle advisory from site identification through zoning, permitting, and utility commitments.

⚡

Power-Secured Site Sales

Outright sale of entitled, power-secured, shovel-ready infrastructure platforms — not raw land.

🏢

Phased Campus Development

Staged build-out aligned to tenant demand and the near-term 19→50 MW power program.

📋

Master Lease Structures

Long-term ground lease arrangements providing operational control with capital flexibility.

🤝

Joint Venture Co-Development

Strategic co-development with institutional or strategic capital partners.

🤖

AI Senior Advisory

AI-powered strategic advisory — site selection, power strategy, deal structuring, and competitive positioning.

Why Russellville Energy Campus

Engineered for Certainty

We eliminate the three biggest risks in data center site acquisition: power, entitlements, and timeline.

Who We Serve

Built for Strategic Users and Capital

Russellville is designed for strategic operators and capital partners that need power-ready land, infrastructure optionality, and execution certainty.

🧠

Inference Developers

🤖

AI Infrastructure Operators

🏭

Industrial 4.0 Users

💼

Institutional Capital

Get Started

Request Data Room Access

Ready to evaluate the Russellville site? Request secure data room access for power, site, utility, and commercial-industrial diligence materials.

Request received